← All product proof
controlled / sanitized · KBL 2.4 structured harness

Controlled Capital KBL corpus A

pass Qualification result from a repeatable fixture capture.

Buyer outcome

Structured harness data became a validated, editable neutral model

48 connectors, 102 wires, 37 fixings and 117 tape/protection occurrences imported; 7/7 measured fields survived the Capital HX2ML round-trip.

What remains: No measured round-trip loss remains for topology, fixings or tape/protection occurrences in this controlled fixture.

100.0%topology recall
48connectors
102wires
0review queue
1 smeasured pipeline time
64.8 MiBpeak resident memory

Topology recall

407 / 407 accepted topology entities

Count-based recall for imported nodes, segments, connectors and wires against the locked acceptance manifest.

Connector, wire and supporting counts

nodes129
segments128
connectors48
wires102
fixings37
tapes117
seals0
cavities281

Inferred versus authored values

ProvenanceCountMeasurementScope
Authored842source-authored accepted entitiesSum of accepted nodes, segments, connectors, wires, fixings, tapes, seals and cavities read from structured KBL occurrences.
Inferred0inferred dashboard acceptance entitiesNo inferred entity is credited toward this structured-import acceptance score.

Review queue

not-required 0 items

Structured acceptance counts require no inference review queue.

Schema validation

passKBL 2.4 SR-1 re-export XSDValidated during controlled acceptance.
passCapital HX2ML 2408 export XSDValidated during controlled acceptance.

Downstream result

pass

Capital HX2ML round-trip

7/7 measured topology and physical-accessory fields preserved, including fixings and tape/protection occurrences.

Runtime and peak memory

OperationWall timePeak RSSResult
KBL to neutral0 s64.8 MiBpass
Neutral to Capital HX2ML1 s7.6 MiBpass
Capital HX2ML re-import0 s63.4 MiBpass

Release · published self-contained CLI · Linux x86_64. 1 second wall clock; peak resident set size for the CLI process tree.