Public synthetic PDF + wirelist
review Qualification result from a repeatable fixture capture.
A drawing and wirelist became an editable harness with a bounded review queue
10/10 authoritative connector identities and 26 conductors were recovered; no connector was staged for manual placement.
What remains: 13 actionable component items remain for engineering disposition; 176 context claims are retained for aggregate evidence review.
Topology recall
Authoritative wirelist connector and wire records recovered in the reconciled neutral harness.
Connector, wire and supporting counts
| nodes | 20 |
|---|---|
| segments | 19 |
| connectors | 12 |
| wires | 26 |
| fixings | 7 |
| tapes | 6 |
| seals | 0 |
| cavities | 52 |
Inferred versus authored values
| Provenance | Count | Measurement | Scope |
|---|---|---|---|
| Authored | 36 | authoritative wirelist records | 10 connector identities plus 26 conductor records. |
| Inferred | 31 | drawing-reconstructed topology entities | 12 connector/splice placements plus 19 vector-derived segments. |
Review queue
13 actionable component items; 176 low-confidence geometry/text claims retained for aggregate evidence review; 14 drawing evidence items auto-accepted; 2 drawing-only connector candidates; 0 authoritative connectors staged for manual placement.
Schema validation
| pass | Neutral harness JSON | Serialized output was parsed for this dashboard and rendered downstream. |
|---|---|---|
| identified | Formboard document-set contract v2 | Contract/version captured by the importer; instance JSON Schema validation is not claimed. |
Downstream result
Wirelist-reconciled neutral formboard
10/10 authoritative connectors placed, 26 wires retained, F1 0.909; visual SVG generated.
Runtime and peak memory
| Operation | Wall time | Peak RSS | Result |
|---|---|---|---|
| PDF + wirelist reconciliation | 2 s | 120.4 MiB | pass |
Release · published self-contained CLI · Linux x86_64. 1 second wall clock; peak resident set size for the CLI process tree.